Project status

Location
Design
Financing
Construction
Operation

Solar park Ommelanderwijk, located between Veendam and Nieuwe Pekela in the province of Groningen, was put into operation in October 2020. The former, polluted industrial site was unusable for farmers and was therefore extensively remediated prior to the construction of the solar park. In total, the solar field has 14,229 solar panels, half of which are monofacial (one-sided) and the other half bifacial (two-sided). This gives Chint Solar the opportunity to test the bifacial solar panels and prove the advantages of these panels over monofacial panels, in an existing situation in the Netherlands.

The solar park – initiated by PowerField – was developed and realised by Chint Solar. The grid connection was also developed and constructed by Chint Solar. In the implementation phase, Chint Solar acted as the main EPC contractor, coordinated various contractors and took responsibility for the grid integration and compliance with local requirements.

It provides green energy to 1,900 households.

Project Specifications

Surface:
5 hectares
Capacity:
5,7 MWp
Households:
1,900